Sod installation across Utah's Wasatch Front — new lawns, and full sod replacement for lawns past saving. We quote by the square foot after a short site visit, and the estimate is free. What decides the price isn't the sod itself; it's how much clearing, grading and soil work the ground needs before the first roll goes down.
Sod installation is priced per square foot, and the sod itself is the smaller part of the number. What moves a sodding cost is how much clearing, grading and soil amendment the ground needs before the first roll arrives.
A flat, clean lot that needs tilling and levelling is straightforward. A yard with a dying lawn to strip out, compacted construction fill underneath, or a grade running back toward the house is a different job entirely — and all of that happens before anyone starts laying sod.
We give you a written sod estimate after a short site visit, at no cost. Rather than quote a square-foot price blind, we measure the yard, check what's under the existing surface and test sprinkler coverage, then price the whole job — so the figure on the estimate is the figure you pay.
When you compare sod installation companies, ask what sits underneath the line item. A quote that covers delivery and installation but not grading, soil amendment or sprinkler adjustment isn't cheaper — it's a smaller job, and the difference shows up the first summer as thin seams and yellow patches.
Not every tired lawn needs replacing. But once bare patches, thatch and weeds cover more than about half of it, resodding is usually cheaper than nursing it back across two or three seasons of overseeding and treatment.
Sod replacement means stripping the old lawn out, not laying over it. New sod laid on top of dead turf doesn't root — it sits on decomposing thatch, dries in patches and lifts at the seams inside a year. We remove the old lawn, deal with whatever killed it (usually compaction, drainage, or a sprinkler system that never covered properly), re-grade, and lay fresh.
Sod can go down any time the ground isn't frozen, but the Wasatch Front has two windows that make establishment far easier: roughly mid-April through early June, and late August through October. In both, the soil is warm enough for roots to move while the air isn't pulling moisture out faster than you can put it back.
Midsummer installation is possible and we do plenty of it, but it is a watering commitment rather than a casual one. Fresh sod in a Utah July can want water two or three times a day for the first week, and one missed day at the wrong moment shows up as brown seams that take the rest of the season to fill.
The first three weeks decide the lawn. Sod arrives with about an inch of soil and no root system beyond it, so everything depends on keeping that layer and the ground beneath it consistently damp until roots bridge the two. We set the watering schedule with you at handover — and if we installed your irrigation, we program it before we leave.
Every landscape begins with a conversation. Tell us about your property and how you want to live outside — we’ll take it from there.
Request a Consultation